Hey Guys, I am about to Upgradde pt6 zikula to Zikula 1.1.2 The upgrade process should take between 10-20 Minutes using the zikula patch files.
I have backed up the database to : /usr/share/zikula-preupgrade-backup
The Theme has been copied to the theme SVN as mentioned in a previous email to the designs list.
Regards, Keiran Smith - Fedora Ambassador / BugZapper / Designer - affix@fedoraproject.org - Free Software Foundation Associate - keiran.smith@member.fsf.org - http://keiran-smith.net - Call me on +44 (0) 131 208 4347
Zikula Upgraded to Zikula 1.1.2
On Fri, Sep 4, 2009 at 8:59 PM, Affix affix@ihack.co.uk wrote:
Hey Guys, I am about to Upgradde pt6 zikula to Zikula 1.1.2 The upgrade process should take between 10-20 Minutes using the zikula patch files.
I have backed up the database to : /usr/share/zikula-preupgrade-backup
The Theme has been copied to the theme SVN as mentioned in a previous email to the designs list.
Regards, Keiran Smith
- Fedora Ambassador / BugZapper / Designer - affix@fedoraproject.org
- Free Software Foundation Associate - keiran.smith@member.fsf.org
- http://keiran-smith.net
- Call me on +44 (0) 131 208 4347
On 09/04/2009 04:40 PM, Affix wrote:
Zikula Upgraded to Zikula 1.1.2
Wow - and the skin's back up on there as well (as a checkout from an SVN repository, svnfedora-zikula-theme, w00t)! Thanks, Keiran - this is fantastic.
Do the instructions on https://fedoraproject.org/wiki/How_to_set_up_a_Zikula_sandbox still work, or is there anything we need to do to edit them to reflect the install process for 1.1.2?
--Mel
infrastructure@lists.fedoraproject.org