Planned Outage - Server updates - 2018-05-09 12:00 UTC
There will be an outage starting at 2018-05-09 12:00 UTC, which will last approximately 4 hours.
To convert UTC to your local time, take a look at http://fedoraproject.org/wiki/Infrastructure/UTCHowto or run:
date -d '2018-05-09 12:00UTC'
Reason for outage:
Ibiblio is moving systems to a newer rack with 10G SFP+ networks. Systems will need to be powered down, moved over to the new racks, powered back up, configured to use the new networks in failover mode.
Affected Services:
download-ib01.fedoraproject.org pagure-proxy01.fedoraproject.org proxy04.fedoraproject.org noc02.fedoraproject.org unbound-ib01.fedoraproject.org ns02.fedoraproject.org people02.fedoraproject.org proxy12.fedoraproject.org smtp-mm-ib01.fedoraproject.org torrent02.fedoraproject.org
Torrent and people will be down during that time. Systems configured to use download-ib02 will also be.
Ticket Link:
https://pagure.io/fedora-infrastructure/issue/6915
Please join #fedora-admin or #fedora-noc on irc.freenode.net or add comments to the ticket for this outage above.
infrastructure@lists.fedoraproject.org